Anthony Aiyedun
FSAE Assembly Manufacturing

FSAE Assembly ManufacturingUniversity Project

2023

Back to Projects

I collaborated with a team of five mechanical engineering students to design and plan the manufacturing of a Formula-style race car pedal box assembly. Using SolidWorks, I modeled the full assembly—including the frame, clevises, rails, carriages, and pedals—and created complete 2D drawings with GD&T specifications suitable for production. I developed manufacturing process plans and travelers for CNC milling, manual machining, bending, and other fabrication steps needed to produce 200 assemblies annually at a target cost of $500 per unit, estimating $100,000 in yearly revenue.

Click an image to view it full-size.

Highlights

Modeled the full pedal box assembly in SolidWorks with GD&T drawings.

Developed manufacturing process plans and travelers for CNC milling, manual machining, and bending.

Scaled plan to produce 200 assemblies annually at a target cost of $500 per unit, estimating $100,000/year revenue.

Skills Used

GD&T ApplicationCNC / Manual Machining Process PlanningDesign for Manufacturing & Assembly (DFMA)Cost Estimation, Scalability Analysis & Revenue ModelingSolidWorksAssembly Design

Related Documents